To ensure the longevity that an ArcCan shade offers, it's vital that the structure is installed by trained professionals. That's where our groundwork and installation teams come in, who operate countrywide with the south of the UK covered by our own staff and further afield through selected fully trained sub-contractors.
We can provide a complete turnkey solution if required or work with main contractors to install our structures on to foundation pads already in place. Our expertise is in ensuring that tensile fabric canopies are accurately tensioned without ripples or creases and they will function for many years in all weather conditions. Our installation team is well equipped to deal with the usual challenges that are presented on-site including accessing internal confined courtyards and significant heights.
Whilst most steelwork is supplied already painted or powder coated, larger structures benefit from being painted on site once erected to avoid handling damage, this work is carried out by expert sub-contractors working to our specifications.
Outside the UK we have strategic alliances with a number of civil engineering companies that provide installation services for us in-country. This has allowed us to see our structures installed worldwide, including:
- Tenerife, Spain
- Tripoli, Libya
- Addis Ababa, Ethiopia
- Kathmandu, Nepal
- Lagos, Nigeria
- Tatev, Armenia
- Strovolos, Cyprus